Stoney Creek - Preliminary Works (2013)

Preliminary work was done on Stoney Creek in the fall of 2013. The Department of Fisheries and Oceans funded NEWSS to initiate a watershed health assessment in the Stoney Creek watershed. There are 49 crossings on Stoney Creek - of which 9 were assessed and 6 of those were considered barriers to fish. A total of 353 riparian buffers were analyzed and 77 of those were identified as problematic. Read the full preliminary assessment report here:

Stoney Creek Preliminary Watershed Health Assessment (2013)

Soil sampling was carried out on September 4, 2014 on several sites along Stoney Creek. The samples were taken to measure metal levels in the soil. In a few cases, samples exceeded the Interim Sediment Quality Guidelines (ISQG). The samples were taken by the Integrated Watershed Research Group at UNBC as part of the NEEF-funded project. Review the location and results of the soil sampling here:

Stoney Creek Sediment Sampling Results (August 2014)

Map showing areas identified for habitat restoration work.

RETURN

PREVIOUS Stoney Creek - KP 2+175 (2014)

Watersheds